Manufacturing logistics that keeps the line fed and the dock clear
Manufacturing logistics at CFL covers both ends of the plant: inbound components and raw materials held off-site and delivered to the line on a schedule, and finished goods moved out by LTL, truckload or same-day inside 100 miles. Nine facilities in seven states, from Los Angeles to New York, give manufacturers overflow space and outbound lanes without adding plant square footage.
The challenge
Three things we hear on the first call, in the words we hear them.
01“The plant floor is not a warehouse.”
Raw material and finished goods compete for the same square footage, and production space loses.
02“A late inbound pallet stops the line.”
When a component is two days out and the line needs it tomorrow, the cost is measured in idle hours, not freight dollars.
03“Outbound freight is nobody’s job.”
Shipping is handled between production and the front office; carriers are booked by whoever has time, and the invoices are never audited.
How CFL runs it
Four steps, one account, one operator with their name on it.
Hold inbound off-site
Components and raw materials received into pallet positions near the plant, counted and reported against your PO.
Deliver to the line
Scheduled or same-day deliveries inside 100 miles bring material to the dock when production needs it, not when the carrier gets around to it.
Stage finished goods
Outbound product stored, kitted or built into customer orders at the facility, clearing the plant floor.
Ship & audit
LTL, truckload and same-day booked from one desk, with every invoice audited and reported in the monthly cost-savings report.
What is your freight profile?
Pallet or parcel, container or domestic, urgent or scheduled. Three answers return the line items we would quote first — then build your manifest and an operator prices it.
Relevant services
All six line items →Questions manufacturing shippers ask
Anything not here: (818) 917-4966.
Can CFL deliver components to our plant on a fixed schedule?
Do you handle kitting or light assembly?
How is inbound material tracked?
What if we only need overflow space for a few months?
Get a manufacturing logistics plan.
Build your manifest — storage, 3PL, consolidation, same-day — and a CFL operator countersigns with a line-item proposal within one business day.